The Last Detail
Spreadsheet workflow

Kakobuy Spreadsheet change log for buying decisions

Record decision changes as new rows and make it possible to reconstruct a shortlist on a particular date.

Make each decision change an event

Record event ID, variant ID, time, old state, new state and reason. For example, at 09:10 V014 moves from pending to ready after a photo arrives. At 15:40 it moves back to pending because the photo shows another size. Keep both events.

Reconstruct the decision view as of a cutoff

For each variant, show the state from its latest event at or before the chosen time. At noon V014 was ready. At 16:00 it was pending. Give events with the same time a sequence number. To correct a mistake, add a correction event with a reference to the original.